Enter up to six groups of windows with a count and your own low and high unit prices in Canadian dollars. Add a project allowance and your chosen contingency and tax percentages. The planner totals those inputs and identifies unpriced rows. Frame, glazing, installation and cladding notes describe your scenario; they do not trigger automatic price multipliers.
Canadian planning context. Technical examples from other regions are identified in the guide; approval and performance requirements must be checked for the actual building and jurisdiction. Original explanatory diagrams are not construction details.
- This is arithmetic on your inputs, not a quotation, market survey or price prediction.
- Use written comparable quotes where possible; label any owner-selected assumptions.
- Blank prices leave a row unpriced. A partial subtotal is not a complete project budget.
- Allowances and contingency enter before the user-selected tax scenario; check the actual invoice treatment.
- Product and installation notes record assumptions without changing arithmetic.
Window Budget Planner
01 /What this worksheet tells you
The useful question is: 'What do my current prices add up to, and what is still missing?' The planner answers it without assigning prices to material names or adding a hidden standard installation charge. It can summarize a contractor's ranges, compare owner-selected scenarios or show how an explicitly priced alternate changes a project. It cannot decide whether an amount is competitive or a window suitable.
Prepare an inventory in the Window Project Workbook first. Separate products and methods into rows. Six identical casements may form one group; a patio door, a bay and two full-frame basement openings deserve separate groups. For more than six groups, use another worksheet or another pass and count project-wide allowances only once.
02 /Input guide and limits
| Input | Meaning | Check |
|---|---|---|
| Label or type | Your opening or group name | Use the quote's opening ID |
| Count | Whole units, 0 to 60 per row | Units and assemblies use consistent definitions |
| Low and high unit price | Your CAD range for one unit | Same scope at both ends; high is not below low |
| Project allowance | One non-negative CAD amount | No duplicate work already in unit prices |
| Contingency | Your percentage, 0% to 50% | Reserve, not authorization for extra work |
| Tax | Your percentage, 0% to 30% | Simple scenario, not tax advice |
| Product and installation notes | Frame, glass, method and cladding | No arithmetic multiplier applies |
Allowances and percentages start at zero. A count with blank prices means 'not priced yet', not free. Correct negative, non-finite or reversed ranges before using a result. Keep the source quote beside the worksheet with its revision date, expiry and exclusions. A precise calculated total cannot improve uncertain inputs.
03 /How the calculation works
- Multiply each priced row's quantity by its low and high unit prices.
- Sum those rows and add your project allowance to both endpoints.
- Apply your contingency percentage to each amount.
- Apply your tax scenario to each resulting modelled subtotal.
- Keep unpriced rows separate and resolve them before treating the result as a full budget.
For arithmetic only, imagine two units at an assumed $1,000 to $1,200 each and a $300 allowance. That yields $2,300 to $2,700 before contingency and tax. A chosen 10% reserve makes $2,530 to $2,970; a chosen 5% tax scenario makes $2,656.50 to $3,118.50. These invented example amounts are not market estimates or recommended percentages. Read the cost guide to build evidence-based inputs.
If unit prices already include tax, an added tax percentage counts it twice. Different real items may have different tax treatments, credits or provincial rules. Reconcile those outside this simple model. No rebate is deducted automatically and no incentive payment is treated as approved.
04 /Define the unit-price boundary
An installed price may include product, removal, insulation, flashing, trim and disposal. A supply-only price includes none of these unless stated. Either boundary works when recorded consistently. Do not mix supply-only and fully finished prices without adding the missing scope explicitly. Record separately priced delivery, access equipment and permits in the project allowance only when they are not already included.
- Confirm screens, extension jambs, hardware and finishes.
- Use the supplier's actual price for alternate glass, colour or operation.
- Leave unknown structural or concealed-damage work unresolved until assessed.
- Check whether final measurement will change a preliminary price.
- Record whether unused allowances are credited and how extra work is approved.
05 /Use ranges honestly
The range is not a confidence interval; it is the result of the endpoints you typed. If one endpoint excludes trim and another includes it, the range mixes scopes. Normalize the proposals first or label the difference. A wide result is not automatically more dependable than a narrow one.
Give every unpriced row a next action: 'Supplier to price laminated-glass alternate', 'Installer to inspect retained frame', or 'Board to confirm approved assembly'. An explicit missing price can be more useful than a guess. The specification schedule describes what the supplier needs, and the change-order guide tracks later revisions.
06 /Document the source of your inputs
For each row, keep a note naming the supplier, quote revision, date, expiry and price boundary. Record whether your lower and upper values are two offers for the same scope or your own scenario assumptions. An owner-selected range should remain labelled as an assumption when shared with another person. If a supplier revises the product or installation method, save the prior result and start a new dated version rather than quietly changing its input source.
07 /Budgeting is separate from design approval
This tool does not inspect walls, verify order dimensions, choose structural ratings, determine egress or safety glazing, approve a contractor, establish compliance or validate rebate eligibility. Approximate homeowner dimensions brief a supplier; they are not fabrication instructions. Resolve who measures, which documents govern the order, who designs the wall connections and how substitutions are approved before committing.
Use the Window Quote Checker to identify missing inclusions, then obtain opening-specific answers. A budget may be arithmetically correct while the proposed design is unsuitable. Keep the worksheet beside the signed scope and the supplier's verified schedule, not in place of them.
FAQQuestions people ask
Why no standard material premium?
Material, series, size, finish, ratings and installation vary too much for a national multiplier to establish a dependable price. Enter observed quotes or labelled assumptions.
What happens to a blank price?
Its row stays unpriced; no invented amount is added. Resolve it before interpreting the subtotal as a whole-project budget.
How do I enter a fixed quote?
Use the same amount as the low and high unit price, with the quotation's quantity and scope.
Can I mix methods?
Yes. Use the appropriate entered prices and clearly labelled rows; the method notes do not alter them automatically.
Is the tax result authoritative?
No. It is a simple percentage scenario. Check the actual invoice, included taxes and applicable treatment.



