HAUSE HOME NETWORKinfo@hause.caCall HAUSE intake · 587-316-6194
HAUSEWINDOWS · REPLACEWINDOWS.CA
Budget worksheet

Window Budget Planner: calculate a project from your own prices

Enter your own window quantities and quote prices, then model allowances, contingency and tax. Unpriced openings stay visible without invented estimates.

Conceptual architectural illustration: build an opening-by-opening plan. Count, type, frame, glass, method
The window field guideBuild an opening-by-opening planCount · type · frame · glass · method
Short answer

Enter up to six groups of windows with a count and your own low and high unit prices in Canadian dollars. Add a project allowance and your chosen contingency and tax percentages. The planner totals those inputs and identifies unpriced rows. Frame, glazing, installation and cladding notes describe your scenario; they do not trigger automatic price multipliers.

Canadian planning context. Technical examples from other regions are identified in the guide; approval and performance requirements must be checked for the actual building and jurisdiction. Original explanatory diagrams are not construction details.

Key takeaways
  • This is arithmetic on your inputs, not a quotation, market survey or price prediction.
  • Use written comparable quotes where possible; label any owner-selected assumptions.
  • Blank prices leave a row unpriced. A partial subtotal is not a complete project budget.
  • Allowances and contingency enter before the user-selected tax scenario; check the actual invoice treatment.
  • Product and installation notes record assumptions without changing arithmetic.
Free tool · runs in your browser

Window Budget Planner

Common replacement window typesSix common window types shown in elevation with how they open: casement (side-hinged), awning (top-hinged), slider, single or double hung, picture (fixed) and bay. CASEMENT AWNING SLIDER HUNG PICTURE (FIXED) BAY ELEVATIONS · SWING LINES POINT TO THE HINGE SIDE
Fig. 1Common window types and how they open.

01 /What this worksheet tells you

The useful question is: 'What do my current prices add up to, and what is still missing?' The planner answers it without assigning prices to material names or adding a hidden standard installation charge. It can summarize a contractor's ranges, compare owner-selected scenarios or show how an explicitly priced alternate changes a project. It cannot decide whether an amount is competitive or a window suitable.

Prepare an inventory in the Window Project Workbook first. Separate products and methods into rows. Six identical casements may form one group; a patio door, a bay and two full-frame basement openings deserve separate groups. For more than six groups, use another worksheet or another pass and count project-wide allowances only once.

02 /Input guide and limits

What you supply
InputMeaningCheck
Label or typeYour opening or group nameUse the quote's opening ID
CountWhole units, 0 to 60 per rowUnits and assemblies use consistent definitions
Low and high unit priceYour CAD range for one unitSame scope at both ends; high is not below low
Project allowanceOne non-negative CAD amountNo duplicate work already in unit prices
ContingencyYour percentage, 0% to 50%Reserve, not authorization for extra work
TaxYour percentage, 0% to 30%Simple scenario, not tax advice
Product and installation notesFrame, glass, method and claddingNo arithmetic multiplier applies

Allowances and percentages start at zero. A count with blank prices means 'not priced yet', not free. Correct negative, non-finite or reversed ranges before using a result. Keep the source quote beside the worksheet with its revision date, expiry and exclusions. A precise calculated total cannot improve uncertain inputs.

03 /How the calculation works

  1. Multiply each priced row's quantity by its low and high unit prices.
  2. Sum those rows and add your project allowance to both endpoints.
  3. Apply your contingency percentage to each amount.
  4. Apply your tax scenario to each resulting modelled subtotal.
  5. Keep unpriced rows separate and resolve them before treating the result as a full budget.

For arithmetic only, imagine two units at an assumed $1,000 to $1,200 each and a $300 allowance. That yields $2,300 to $2,700 before contingency and tax. A chosen 10% reserve makes $2,530 to $2,970; a chosen 5% tax scenario makes $2,656.50 to $3,118.50. These invented example amounts are not market estimates or recommended percentages. Read the cost guide to build evidence-based inputs.

If unit prices already include tax, an added tax percentage counts it twice. Different real items may have different tax treatments, credits or provincial rules. Reconcile those outside this simple model. No rebate is deducted automatically and no incentive payment is treated as approved.

04 /Define the unit-price boundary

An installed price may include product, removal, insulation, flashing, trim and disposal. A supply-only price includes none of these unless stated. Either boundary works when recorded consistently. Do not mix supply-only and fully finished prices without adding the missing scope explicitly. Record separately priced delivery, access equipment and permits in the project allowance only when they are not already included.

  • Confirm screens, extension jambs, hardware and finishes.
  • Use the supplier's actual price for alternate glass, colour or operation.
  • Leave unknown structural or concealed-damage work unresolved until assessed.
  • Check whether final measurement will change a preliminary price.
  • Record whether unused allowances are credited and how extra work is approved.

05 /Use ranges honestly

The range is not a confidence interval; it is the result of the endpoints you typed. If one endpoint excludes trim and another includes it, the range mixes scopes. Normalize the proposals first or label the difference. A wide result is not automatically more dependable than a narrow one.

Give every unpriced row a next action: 'Supplier to price laminated-glass alternate', 'Installer to inspect retained frame', or 'Board to confirm approved assembly'. An explicit missing price can be more useful than a guess. The specification schedule describes what the supplier needs, and the change-order guide tracks later revisions.

06 /Document the source of your inputs

For each row, keep a note naming the supplier, quote revision, date, expiry and price boundary. Record whether your lower and upper values are two offers for the same scope or your own scenario assumptions. An owner-selected range should remain labelled as an assumption when shared with another person. If a supplier revises the product or installation method, save the prior result and start a new dated version rather than quietly changing its input source.

07 /Budgeting is separate from design approval

This tool does not inspect walls, verify order dimensions, choose structural ratings, determine egress or safety glazing, approve a contractor, establish compliance or validate rebate eligibility. Approximate homeowner dimensions brief a supplier; they are not fabrication instructions. Resolve who measures, which documents govern the order, who designs the wall connections and how substitutions are approved before committing.

Use the Window Quote Checker to identify missing inclusions, then obtain opening-specific answers. A budget may be arithmetically correct while the proposed design is unsuitable. Keep the worksheet beside the signed scope and the supplier's verified schedule, not in place of them.

FAQQuestions people ask

Why no standard material premium?

Material, series, size, finish, ratings and installation vary too much for a national multiplier to establish a dependable price. Enter observed quotes or labelled assumptions.

What happens to a blank price?

Its row stays unpriced; no invented amount is added. Resolve it before interpreting the subtotal as a whole-project budget.

How do I enter a fixed quote?

Use the same amount as the low and high unit price, with the quotation's quantity and scope.

Can I mix methods?

Yes. Use the appropriate entered prices and clearly labelled rows; the method notes do not alter them automatically.

Is the tax result authoritative?

No. It is a simple percentage scenario. Check the actual invoice, included taxes and applicable treatment.

Keep reading

Related guides

Give every opening its own recordOpening ID and room. Approximate size + observation. Installer verifies order dimensions. Original conceptual study; not to scale, an installation detail or a product specification.HAUSE / WINDOW STUDY1. Opening ID and room2. Approximate size + observation3. Installer verifies order dimensionsGive every opening its own recordTools

Window Project Workbook: give every opening its own record

Build a homeowner window inventory with room, approximate size, operation, condition, orientation and priorities; print, copy or export it as a briefing worksheet.

6 min read
Conceptual architectural illustration: price the entire scope. Units, installation, finishing, accessCosts

Window replacement cost: the complete scope behind the price

Build a Canadian window budget from comparable quotes. Separate product, installation, finishing, access and allowances without invented national averages.

6 min read
Conceptual architectural illustration: compare what the quotes include. Scope, warranties, exclusionsTools

Window Quote Checker: compare window quotes on what they actually include

Window Quote Checker: compare up to three window replacement quotes on price per window, warranties and ten inclusions, with questions to ask each one.

6 min read
Separate product from installation scopeAssembly and performance. Wall-interface requirements. Evidence + acceptance criteria. Original conceptual study; not to scale, an installation detail or a product specification.HAUSE / WINDOW STUDY1. Assembly and performance2. Wall-interface requirements3. Evidence + acceptance criteriaSeparate product from installation scopeSpecification

The window specification schedule: make each opening unambiguous

Connect opening IDs to exact products, whole-window ratings, glass, hardware, installation scope, approved substitutions and handover evidence.

6 min read
Conceptual architectural illustration: separate product and installation promises. Scope, coverage, exclusions, termPlanning

Window replacement quotes and warranties: what a complete quote says

What a window replacement quote should include, why windows cost what they do, product vs installation warranties, deposits, and red flags in Canada.

6 min read
Make a changed scope traceableOriginal agreed scope. Written change and reason. Cost + schedule + approval record. Original conceptual study; not to scale, an installation detail or a product specification.HAUSE / WINDOW STUDY1. Original agreed scope2. Written change and reason3. Cost + schedule + approval recordMake a changed scope traceableSpecification

When the window project changes: record the decision before it disappears

A practical system for window substitutions, concealed damage, revised dimensions, allowances, schedule changes and an owner archive with a clear approval trail.

6 min read
Request quotes

Describe the problem once. Get a straight answer.

Tell us what you are seeing — when it happens, where, the age of the house and anything you have already been told or quoted. The HAUSE Home desk replies with next steps and, where available, a local contractor for the job.

Keep people and pets clear of damaged glass and the opening. Arrange professional make-safe service for loose glass or an unsecured window.

Tell us about the job

Share your window scope and how to reach you. HAUSE may contact you about the request.

HAUSE Home is an independent network, not a contractor. See our privacy notice.

The HAUSE Home network

Focused home portals from HAUSE.